Inhaltszusammenfassung zur Seite Nr. 1
Installation & Operating Manual
Trident Boilers: SF160, SF260, SF360
Portland
“Ce manuel est disponible en Français sur demande”
R8
SAFETY NOTICE
PLEASE READ THIS ENTIRE MANUAL BEFORE YOU INSTALL AND/OR USE YOUR NEW
BOILER. FAILURE TO FOLLOW INSTRUCTIONS MAY RESULT IN PROPERTY DAMAGE,
BODILY INJURY, OR EVEN DEATH.
IF THIS HARMAN BOILER IS NOT PROPERLY INSTALLED, A HOUSE FIRE MAY RESULT. FOR
YOUR SAFETY, FOLLOW INSTALLATION DIRECTIONS.
CONTACT LOCAL BUILDING OR FIRE OFFICIALS ABOUT RESTRICT
Inhaltszusammenfassung zur Seite Nr. 2
Inhaltszusammenfassung zur Seite Nr. 3
Introduction Congratulations, You have just purchased the finest wood / coal boiler available. Harman Trident boilers are constructed of high quality materials and are manufactured by a highly skilled team of assemblymen. Each boiler is inspected and pressure tested for quality assurance. This manual is designed to provide all of the basic information needed for a safe and proper installation. However, there are many skills needed that can not be learned by reading this manual. Harman Home
Inhaltszusammenfassung zur Seite Nr. 4
Packing List Items needed for assembly and installation. Please notify your Harman Dealer if you are missing any items. Included with Boiler: --Shaker Handle --ash Pan --Warranty Registration Form Items In Boiler Kit # 1-00-01020: (Sold Separately) --Johnson Controls aquastat - (3) pieces; a350 Controller w/ Sensor wire S350 Stage Module Y350 Power Supply --Immersion Well --Din Rail and (2) End Clamps --Terminal Box --Terminal Block and (2) #8-32 nuts --Pressure Relief Valve (30 psi.) --Tempera
Inhaltszusammenfassung zur Seite Nr. 5
Installation Getting Started Pressure Relief Valve Domestic Hot Water Coil Option The sheet metal sides and top are easily removed to reduce the chance of dents and/or scratches in Temp/Pressure Gauge the finish. Simply lift the top off, and that will allow the sides to be pulled away and up, for removal. To re-install, slide the channel, at the bottom of Immersion Well each side piece, over the lip at the bottom of the boiler, and hold downward while moving the side Optional Electric J
Inhaltszusammenfassung zur Seite Nr. 6
Installation Bolt the automatic Draft Control through the 1/2 Aquastat Installation in. hole in the center of the bottom door. Be sure (See optional items, page 7) lay the din rail on to hold the Draft Control straight while tightening. a flat surface, with the flat side down. Secure Feed the two wires from the draft motor through the one end clamp, on the left side. Slide the a350 flexible conduit and a 90˚ fitting. Secure the fitting controller onto the rail from right to left until it
Inhaltszusammenfassung zur Seite Nr. 7
Installation Wiring and Electrical Optional Items Following the wiring diagram, run all wires to their There is a domestic hot water coil available for your designated connections. Save the main power for the Trident Boiler. The coil installs in the front of the boiler, last hook-up, and leave the breaker in the off position. and allows your domestic water to be heated by the The sensor wires attach to the a350 Controller on the heating system water. Install the coil now, by removing termina
Inhaltszusammenfassung zur Seite Nr. 8
Installation 3 feet (0.9m) above the point at which they exit Plumbing from the roof, it must also extend 2 feet (0.6m) The Harman Trident Boiler can be used as a above the highest point within a 10 ft. (3m) radius. “Stand alone” boiler or as an add-on to an existing hot water heating system. DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE THAT IS SERVING ANOTHER APPLIANCE. The diagrams in this manual are meant to show the necessary equipment and piping. Your system NOTE: The restriction of no
Inhaltszusammenfassung zur Seite Nr. 9
Installation The circulator installed between the two boilers may be hooked up to run continuously during the heating season or, an additional S350 control (not supplied) could be installed to turn it on and off automatically. This control must be used as a “close on rise of temperature” (jumper in cooling position). Harman Home Heating recommends that 1-1/4 in. pipe be used between the two boilers. also recommended is that the first section of pipe off of the top of the Trident Boiler be thr
Inhaltszusammenfassung zur Seite Nr. 10
Operation Automatic Draft Control Starting a Wood Fire The heat output is regulated by the automatic Make sure the boiler and all piping is full of water draft control on the bottom door. The electric and that all air has been purged from the system. motor (a) opens and closes the flapper door (B). Never start a fire without water in the Opening and closing the flapper door regulates system. An explosion will occur. the air flow into the firebox. Turn on electrical power to the boiler. Thi
Inhaltszusammenfassung zur Seite Nr. 11
Operation Starting a Coal Fire Loading Make sure the boiler and all piping is full of water Coal should never be added unless there is a and that all air has been purged from the system. reasonably hot fire. The coal bed should be bright and vigorous. If you have an active coal bed, full Never start a fire without water in the loads can be added at any time. If not, add new system. An explosion will occur. coal in layers, as described in starting a coal fire. Turn on electrical power to the
Inhaltszusammenfassung zur Seite Nr. 12
Operation During the first few hours of burning, a blue Safety Tips smoke may be observed rising from the boiler. When opening the firebox door, it should be This is the paint going through the curing process. cracked, slightly open, for a few seconds to allow It is advisable to increase the amount of fresh air in to burn any gases which may be present. air in the room during this break in period. This This will also allow smoke to be drawn away from can be achieved by opening doors and
Inhaltszusammenfassung zur Seite Nr. 13
Maintenance The spiral chamber is basically self-cleaning. However, if there is a draft problem and you have been burning wood for a long time with little demand, the spiral chamber will need to be cleaned. To clean the spiral chamber, remove the stovepipe and scrape any creosote or debris from the top and front of the chamber. The rear of the chamber should not have much accumulation. If it does, clean it out. nOTE: 1/4” to 1/2” of creosote in the spiral chamber is normal. The pipes inside t
Inhaltszusammenfassung zur Seite Nr. 14
Warranty harman™ Central heatinG ProduCts limited Warranty Hearth & Home Technologies Inc., on behalf of its Harman™ brand (”HHT”), extends the following warranty for all Harman™ furnace and boiler products (“Products”) that are purchased from an HHT authorized dealer. Warranty Coverage: Subject to the conditions, exclusions and limitations set forth below, HHT warrants to the original owner of the Products, and to any transferee taking ownership of the Products at the site of original instal
Inhaltszusammenfassung zur Seite Nr. 15
Notes notes 15 15
Inhaltszusammenfassung zur Seite Nr. 16
Service & Maintenance Log Date Of Service Performed By Description Of Service 16
Inhaltszusammenfassung zur Seite Nr. 17
Service Parts SF160 Wood, Coal fi red Boiler Beginning Manufacturing Date: N/A Ending Manufacturing Date: Active 1-70-03233 11 1 2 3 4 8 9 10 5 6 7 IMPORTanT: THIS IS DaTED InFORMaTIOn. When requesting service or replacement parts for your appliance please provide model number and serial number. all parts listed Stocked in this manual may be ordered from an authorized dealer. at Depot ITEM DESCRIPTION COMMENTS PART NUMBER 1 Safety Relief Valve 3-10-77382 Y 2 Press/temp Gauge-Rear Mount 3-10
Inhaltszusammenfassung zur Seite Nr. 18
Service Parts SF160 Beginning Manufacturing Date: N/A Ending Manufacturing Date: Active IMPORTanT: THIS IS DaTED InFORMaTIOn. When requesting service or replacement parts for your appliance please provide model number and serial number. all parts listed Stocked in this manual may be ordered from an authorized dealer. at Depot ITEM DESCRIPTION COMMENTS PART NUMBER 6 long Shaker Handle Weldment 1-10-01005 Y Shaker Bar Weldment 4-1/4” 1-10-02017W Y Shaker Block 2-00-01037-1 Y Shaker Bracket
Inhaltszusammenfassung zur Seite Nr. 19
Service Parts SF260 Beginning Manufacturing Date: N/A Wood, Coal fi red Boiler Appliance Ending Manufacturing Date: Active 1-70-03236 10 1 2 3 7 8 9 4 5 6 IMPORTanT: THIS IS DaTED InFORMaTIOn. When requesting service or replacement parts for your appliance please provide model number and serial number. all parts listed Stocked in this manual may be ordered from an authorized dealer. at Depot ITEM DESCRIPTION COMMENTS PART NUMBER 1 Safety Relief Valve 3-10-77382 Y 2 Press/temp Gauge-Rear Mount
Inhaltszusammenfassung zur Seite Nr. 20
Service Parts SF260 Beginning Manufacturing Date: N/A Ending Manufacturing Date: Active IMPORTanT: THIS IS DaTED InFORMaTIOn. When requesting service or replacement parts for your appliance please provide model number and serial number. all parts listed Stocked in this manual may be ordered from an authorized dealer. at Depot ITEM DESCRIPTION COMMENTS PART NUMBER 5 long Shaker Handle Weldment 1-10-01005 Y Shaker Bar Weldment 4-11/16” 1-10-02018W Y Shaker Block 2-00-01037-1 Y Shaker Bracke