Inhaltszusammenfassung zur Seite Nr. 1
Honeywell BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN
Quick Setup
Q7055A
In order to setup the BNA device properly,
BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN
the following connections are prerequisite:
• Null-Modem cable connected to a PC
INSTALLATION INSTRUCTION & USER MANUAL
running a VT100 terminal emulation
program or a VT100 compatible terminal
(refer to Table 6-1: Terminal settings)
• LAN connection either via UTP (RJ45
connector) or AUI.
• Power connection.
• An active FTP-Server machine on the
Inhaltszusammenfassung zur Seite Nr. 2
BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN Technical Data Supply Voltage 18-24 VAC (50...60 Hz); 18-24 VDC (external power supply required) BNA - 2DN Honeywell Power Consumption 5VA (connected via 10BaseT, BNA - 2DN Honeywell twisted pair); 12VA LAN Ch1 Ch2 Ch2 (connected via 10Base5, AUI) LAN Ch1 Reset Mode Col Rx Tx Lnk Rx Tx Rx Tx Power Reset Mode Col Rx Tx Lnk Rx Tx Rx Tx Power Temperature Limits 0...+50 °C (+32...+122 °F); 5...95% rh, non condensing Ambient storage limits: -35...+70 °C (-31...
Inhaltszusammenfassung zur Seite Nr. 3
BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN Table of Contents 1 About BNA ...........................................................5 2 Location of Parts and Controls ..........................8 2.1 Front Side....................................................8 2.2 Rear Side ...................................................11 3 Before Installation.............................................13 4 BNA Operating Positions.................................15 4.1 Single Device ........................
Inhaltszusammenfassung zur Seite Nr. 4
BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN 7 Cables and Connectors .....................................42 7.1 DB9F Null Modem Cable........................42 7.2 Ethernet Connectors ................................44 7.2.1 RJ45 Connector ...............................................44 7.2.1.1 Connecting a BNA to a Hub..........................45 7.2.1.2 Connecting a BNA to a Workstation ............46 7.2.2 AUI Connector................................................47 Tips & Tricks............
Inhaltszusammenfassung zur Seite Nr. 5
BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN 1 About BNA Honeywell XBS TCP/IP LAN BNA-2CS BNA-1C BNA-2DN XCL5010 XCL5010 C - S-Bus XCL5010 XCL5010 B F&S Bus u s L1 Bus The Building Network Adapter (BNA) delivers exceptional price/performance to meet the requirements of both building owners and service providers. With its combination of scalable performance, density, and low per-port pricing, the Building Network Adapter allows network-layer capabilities to be extended to a much wider range of network
Inhaltszusammenfassung zur Seite Nr. 6
BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN the requesting device. Status information like LAN communication activity, field bus traffic communication and system heartbeat of the Building Network Adapter is indicated by LEDs on the front of the device. Technically, the Building Network Adapter provides an interface from various Honeywell controller busses that use RS232/RS485 signals to a local area network using 802.3 Ethernet protocol. This allows data to be used by high-level building management
Inhaltszusammenfassung zur Seite Nr. 7
BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN Additionally, each BNA type is equipped with AUI and RJ45 10Base T connectors plus a RS232 interface. EN1B-0198GE51 R0801 7
Inhaltszusammenfassung zur Seite Nr. 8
BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN 2 Location of Parts and Controls The numbering for the parts and controls in this section is referring to the pictures on the rear side of the title page. In order to have a reference between the numbering here and the device pictures, it is possible to fold this page out. 2.1 Front Side Differences between the various BNA types are explicitly noted in the concerning element description. 1 Reset Hardware reset button. Located directly behind the small hole
Inhaltszusammenfassung zur Seite Nr. 9
BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN Shows the actual LAN traffic using 4 LEDs. Col Collision indicator (Red) If this LED is on, then two or more devices on the network are transmitting at the same time. This is not a fault, but a normal occurrence on an Ethernet network. However, when the Collision LED remains on for all transmission attempts, it may indicate an abnormal condition such as an open end-of-line termination. Rx Receive indicator (Green) on means that data is received by the BNA
Inhaltszusammenfassung zur Seite Nr. 10
BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN the transceiver shows by itself that it is linked properly to the LAN. 4 Ch1 Bus Channel 1 activity display. This display contains two green LEDs, one showing the BNA receive activity (Rx) and the other showing the BNA transmit activity (Tx). 5 Ch2 Bus Channel 2 activity display. This display contains two green LEDs, one showing the BNA receive activity (Rx) and the other showing the BNA transmit activity (Tx). Note: Ch2 indication is available on two chan
Inhaltszusammenfassung zur Seite Nr. 11
BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN 2.2 Rear Side Differences between the various BNA types are explicitly noted in the corresponding element description. 8Ch2 3-pin connector for field bus channel 2 connection electrically isolated meets the EMC-and FCC-requirements. Field Bus wiring is described in chapter 5.2 Field Bus Connection (Ch1 / Ch2) on Page 20. Note: The Ch2 field bus connector is available on two-channel devices only. It is not available on a BNA 1C device. 9 Ch1/Ch2 Bus Termina
Inhaltszusammenfassung zur Seite Nr. 12
BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN 10 Ch1 3-pin connector for field bus channel 1 connection electrically isolated meets the EMC-and FCC-requirements. Field Bus wiring is described in chapter 5.2 Field Bus Connection (Ch1 / Ch2) on Page 20. 11 AC/DC IN 18-24V Power connector for 18-24V AC (50...60Hz) or 18-24V DC power supplies. Power consumption is 5VA (connected via 10BaseT, twisted pair) or 12VA (connected via AUI, 10Base5). An external power supply is required. See also chapter 5.1 Powe
Inhaltszusammenfassung zur Seite Nr. 13
BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN 3 Before Installation Please pay attention to the steps listed below prior to installing the Building Network Adapter device. 1 Verify that the product has been received without damage. 2 Verify that the correct BNA type has been delivered. 3 Check package contents. The following items are included in each product package: Pieces Item 1 Building Network Adapter device 1 Building Network Adapter Installation Instruction & User Manual 1 Small bag with instal
Inhaltszusammenfassung zur Seite Nr. 14
BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN Pieces Item 23 pole Phoenix controller bus channel connectors 4 Optional wall mounting clips 4Small inserts 4Screws 4 Please read chapter 5 Connections on page 19 carefully prior to connecting any power and data interface cables to the BNA. 5 Please refer to the installation instruction manuals of each component that shall be connected to the BNA, like 95-7545 XLS1000 Installation Instructions, 95-7421 FS90 Installation Instructions, and 95-7551 LAN Instal
Inhaltszusammenfassung zur Seite Nr. 15
BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN 4 BNA Operating Positions 4.1 Single Device Figure 4-1: Single device operating position Figure 4-1 shows the normal BNA device operating position e.g. on a desk. EN1B-0198GE51 R0801 15
Inhaltszusammenfassung zur Seite Nr. 16
BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN 4.2 Stacked Devices Figure 4-2: Stacked Devices BNA Devices may also be stacked. Because of stability issues, it is recommended not to stack more than 3 devices. 4.3 Wall Mounting It is also possible to mount the BNA device to a wall. The following sequence describes how the 16 EN1B-0198GE51 R0801
Inhaltszusammenfassung zur Seite Nr. 17
BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN device has to be prepared prior to mounting it to a wall. Put the BNA-adapter with the topside down on the desk (Figure 4-3). Figure 4-3 Remove the four feet (Figure 4-3) from the bottom of the BNA by pushing them horizontally away from the housing with a flat screwdriver (Figure 4-4). Figure 4-4 Push the four inserts (included) fully and horizontally into the housing (Figure 4-5). Figure 4-5 EN1B-0198GE51 R0801 17
Inhaltszusammenfassung zur Seite Nr. 18
BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN Adjust the four retaining clips (included) on top of the inserts. Fasten the retaining clips with the included four screws (Figure 4-6). Figure 4-6 Use the housing with the clips to mark the positions of the four mounting holes on the wall surface. Drill ∅ 4mm (~0.16inch) holes for the mounting screws (not included) and fix the BNA device. Figure 4-7 18 EN1B-0198GE51 R0801
Inhaltszusammenfassung zur Seite Nr. 19
BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN 5 Connections This chapter describes how to connect power and the field bus to the BNA device. Together with the BNA device, a supply pack with installation material is delivered containing the required connectors for power and field bus. 5.1 Power Connection For the BNA device an external power supply with the following specification is required: 18-24V AC (50...60Hz) or 18-24V DC. Power consumption of the BNA device is 5VA (connected via 10BaseT, twisted
Inhaltszusammenfassung zur Seite Nr. 20
BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN 5.2 Field Bus Connection (Ch1 / Ch2) Regardless of the type of BNA device, the wiring of the field bus connector is always identical. For connecting the field bus, the 3 pole Phoenix connectors (included) are required. A B C + C - GND 1 2 Figure 5-1 Figure 5-1 shows the pin layout of the field bus connectors Ch1 and Ch2. Pins 1 and 2 shall be used to connect the field bus. 5.3 Bus Termination Switch This section applies to BNA 2CS and BNA 1C devices only.