ملخص المحتوى في الصفحة رقم 1
2U STORAGE ENCLOSURE
QUICK INSTALL GUIDE
FS4100, FS4500, SC4100, AND FC4100
ملخص المحتوى في الصفحة رقم 2
Kit Contents ■ Adaptec Storage Enclosure (FS4100, FS4500, SC4100, or FC4100) ■ CD, including software, drivers, and documentation ■ Two power cables Note: Mounting rails for rack installations are sold separately. See your Adaptec reseller for purchase information. Installation Checklist ❏ Read and follow the safety tips. See page 2. ❏ Install the enclosure in an equipment rack or tower assembly (optional.) See page 2. ❏ Install the drive carriers. See page 6. ❏ Set the drive slot and enclosur
ملخص المحتوى في الصفحة رقم 3
Safety Tips Caution: A fully loaded enclosure is heavy. Reduce the weight ! of the enclosure by removing the drive carriers before installing the enclosure in the rack or tower. (You can also remove the two APCs to further reduce the weight, if required. See the Adaptec Storage Enclosure Installation and User’s Guide on the CD for instructions.) Caution: To prevent personal injury, have someone assist you ! during rack installation. Caution: If you are installing your enclosure in a rack,
ملخص المحتوى في الصفحة رقم 4
Installing into an Equipment Rack Begin the installation by removing the components from the packaging and placing them on an antistatic surface until you need them. Ensure that you have all these rail kit components: ■ Front rails (1 left, 1 right) ■ Rear rails, two different sizes (2 left, 2 right) ■ Two sizes of screws (10 large, 4 small) ■ Two types of nuts (10 of each) To install your Storage Enclosure in an equipment rack: 1 Secure the front rails to the front supports of the rack, usin
ملخص المحتوى في الصفحة رقم 5
3 Secure the rear rails you selected to the rear supports of the equipment rack, using the supplied screws, as shown in the Figure in Step 1 on page 3. 4 Secure the front rails to the rear rails, as shown below. 5 Tighten all the screws before continuing. 6 With assistance from a second person, lift the Storage Enclosure and slide the rear of the enclosure onto the rails. Slide the enclosure all the way back until it rests completely on the rails, as shown in the Figure below. You can choo
ملخص المحتوى في الصفحة رقم 6
7 Secure the front of the enclosure with one screw on each side, as shown in the next Figure. One screw per side The equipment rack installation is complete. Continue with Step 2: Installing the Drive Carriers on page 6. Installing into a Tower Assembly A tower assembly is also referred to as a deskside assembly or pedestal. Caution: Do not modify the tower assembly. The feet are ! designed to keep the tower from tipping over. Do not remove the acoustic foam inside the tower skin assembly.
ملخص المحتوى في الصفحة رقم 7
3 Remove the tower’s front bezel, as shown below, saving the screws for use in Step 5. Step 3 Step 4 4 Turn the enclosure 90° so that the right hand rack mount ear and LEDs are on top, then slide the Storage Enclosure into the tower skin, as shown above. 5 Replace the front bezel, using the screws removed in Step 3. 6 Install the tower labels at the top and bottom of the tower. Align the holes in the top label with the LEDs on the enclosure. 7 Replace the drive carriers and APCs, if necessar
ملخص المحتوى في الصفحة رقم 8
2 With the cam lever of the drive slot fully open, slide the carrier into the slot until the lever starts to close. 3 Push the cam lever until it engages the latch on the left side of the carrier assembly and clicks into place. 4 Repeat for all drive carriers. Note: Either a drive carrier or a carrier blank must be installed in all the slots of the enclosure to maintain proper airflow and cooling. When all drive carriers are installed, continue with Step 5: Connecting Power Cords to the AP
ملخص المحتوى في الصفحة رقم 9
Connecting SATA Cables The FS4100 and FS4500 Storage Enclosures have removable Small Form-factor Pluggable (SFP) connectors that support copper or optical cables. Ensure that you have the appropriate SFP installed for your cables. See the Adaptec 2U Storage Enclosure Installation and User’s Guide on the CD for more cabling information and for daisy- chaining instructions. JBOD Configuration (FS4100) FS4100 SATA I/O Module HOST 1 EXP 1 HOST 2 EXP 2 HOST BUS ADAPTER HOST BUS ADAPTER Daisy-chai
ملخص المحتوى في الصفحة رقم 10
Connecting FC Cables The FC4100 Storage Enclosure has removable Small Form-factor Pluggable (SFP) connectors that support copper or optical cables. Ensure that you have the appropriate SFP installed for your cables. See the Adaptec 2U Storage Enclosure Installation and User’s Guide on the CD for more cabling information and for daisy-chaining instructions. Single Loop Configuration FC4100 FC I/O Module OUTPUT INPUT Daisy-chain HOST BUS ADAPTER to next FC4100 Dual Loop Configuration FC4100
ملخص المحتوى في الصفحة رقم 11
Connecting Ultra320 SCSI Cables See the Adaptec 2U Storage Enclosure Installation and User’s Guide on the CD for supported cable lengths and additional cabling information. Caution: Use only Ultra320 certified cables. Ultra160 certified ! cables are not supported by the Adaptec SC4100 Storage Enclosure. Single Bus Configuration SC4100 SCSI I/O Module HOST BUS ADAPTER Dual Bus Configuration SC4100 SCSI I/O Module HOST BUS ADAPTER HOST BUS ADAPTER 10
ملخص المحتوى في الصفحة رقم 12
Step 5: Connecting Power Cords to the APC Modules. Connect one of the supplied power cords to each of the APC modules and to a grounded power outlet. Caution: Always use a regulating uninterruptible power ! supply (UPS) to protect your Storage Enclosure. Next Steps See the Adaptec 2U Storage Enclosure Installation and User’s Guide on the CD for instructions on how to complete these final installation and set-up tasks for your specific Storage Enclosure model: ■ Powering on your system and c
ملخص المحتوى في الصفحة رقم 13
R Adaptec, Inc. 691 South Milpitas Boulevard Milpitas, CA 95035 USA ©2004 Adaptec, Inc. All rights reserved. Adaptec and the Adaptec logo are trademarks of Adaptec, Inc. which may be registered in some jurisdictions. Part Number: MAN-4000-QUIK, Rev. 13, LB 07/04