ملخص المحتوى في الصفحة رقم 1
®
5A. RADIANT PANEL SYSTEM
PLANNING & INSTALLATION MANUAL (rev)
ROTH HEATING SYSTEMS
ملخص المحتوى في الصفحة رقم 2
5A. INTRODUCTION ® The Roth Radiant Panel System was developed for the wood frame houses of the North American and Scandinavian markets. It was designed for easy installation over any new or existing sub-floor, wood or concrete, and for use with many different floor coverings, such as carpet, tile or hardwood. This is done without the structural changes needed to accommodate the additional load of lightweight concrete and with minimal effects to the finished floor height. It is ideal
ملخص المحتوى في الصفحة رقم 3
5A. INSTALLATION INSTRUCTIONS 5A.1 Planning ® Roth Radiant Panel Systems can be installed on all types of sub-floors, which comply with the current building regulations for load-bearing structures. If the system is going to be installed upon an existing surface material (e.g. vinyl mat, ceramic tiles, etc.), it must be approved by the flooring contractor. The floor panel system has a normal operating range of 60-140°F (15-60°C), depending on the radiant heating system design and finished
ملخص المحتوى في الصفحة رقم 4
5A. INSTALLATION INSTRUCTIONS 5A.3 Installation of the Panel The sub-floor must be smooth, clean and level. Surface irregularities should not exceed more ® than 0.02" per foot. The Roth Radiant Panel System should be secured to the subfloor with countersunk screws or a foam board compatible adhesive. Apply the adhesive according to the manufacturer’s instructions. Start the installation by laying the radius panel first. If you need an extra track you can start with a transition panel. A
ملخص المحتوى في الصفحة رقم 5
5A. INSTALLATION INSTRUCTIONS Continue to lay the master panels. When cutting the master panels, mark the plate and saw it with EPS side up. You can use any saw with a fine-toothed metal blade. After cutting the panel, remove any burrs. When cutting the last master panel in the first row, use the rest of the panel to start the next row. This will provide staggered joints for the field panels. After completion of the panel installation in an area, use a vacuum to clean up thoroughly
ملخص المحتوى في الصفحة رقم 6
5A. INSTALLATION INSTRUCTIONS 5A.4 Installation of PEX-tubing Start the tubing installation by connecting the PEX tubing to the manifold. Loops can be pre-cut if you have figured the correct leader length (from the manifold to the actual heated area) when designing the system with our software. The Radiant Heating Tubing Requirements Report will give you the information to cut the loops from full rolls of tubing with the least amount of waste. Install the tubes by unrolling the coil
ملخص المحتوى في الصفحة رقم 7
5A. INSTALLATION INSTRUCTIONS 5A.5 Pressure Test/Start-up After installation of the panel and tubing, but before laying the finished floor, you need to perform a pressure test. Fill the system with air or water and maintain a pressure of 2 to 3 times the working pressure of the system, about 25 to 50 psi (1.7 to 3.4 bar) for 6 hours. Use a leak detection solution (if testing with air) to locate and repair any leaks in the system. A small leak can take a long time to register on a 60 psi (
ملخص المحتوى في الصفحة رقم 8
Roth's success is the result of flexibility in products, targeted investments and theme oriented solutions. Our growth stems from continuous research and development of new and innovative products. Manufacturing keys to success are combinations of know-how, modern production sites and equipment, latest production technologies, and motivated personnel. Listed by: Roth Industries, Inc. 77 Circuit Drive North Kingstown, RI 02852 Phone: 401-267-9044; Fax: -9048 http://www.Roth-USA.com • E-mail: