ملخص المحتوى في الصفحة رقم 1
CUSTOM PACKAGED
ELECTRONIC
AIR CLEANER
Model 75 Series Units
WITHOUT
Wash System
Accepted For Use
• INSTALLATION
City of New York
Department of Buildings
• OPERATION
MEA 288-01-E and 88-99-E
• SERVICE
For Model Numbers
75- ______-01 & -03
Electrostatic Precipitators for
Commercial & Industrial
Applications
101 McNeill Road • Sanford, NC 27330
(919) 775-2201 • Fax: (919) 774-8771 • (800) 884-0002
www.trioninc.com
MANUAL PART NO. 154024-002 • July 2002
ملخص المحتوى في الصفحة رقم 2
TABLE OF CONTENTS SECTION I DESIGN For The System Design Engineer Page 1. General Description ................................................................................................................... 1 2. System Design and Layout........................................................................................................ 1 3. Outdoor Installations ...........................................................................................................
ملخص المحتوى في الصفحة رقم 3
If space prohibits, turning vanes, air baffles or other SECTION I DESIGN means may be utilized. Ducting – where attached to the cabinet collars – should be gasketed, caulked or FOR THE SYSTEM DESIGN ENGINEER otherwise made watertight. 1. General Description When there is a danger of rain, snow or debris being The standard major components supplied with each unit drawn into the system with outside air, the make-up air for installation are as follows: intake should be protected with rain louvers,
ملخص المحتوى في الصفحة رقم 4
Preferably, straight down from the drain pan supply ****WARNING**** through the floor. The normally recommended drain line Fire Suppression Systems trap, to seal off the cabinet from the drain against the Extreme caution should be exercised when this unit system pressure, should be located in the heated is installed in applications that are collecting interior. If not installed in this manner, heat wrap or volatile or potentially flammable contaminates such other means should be employed to prev
ملخص المحتوى في الصفحة رقم 5
sloped toward the cabinet drain pan for an 18-inch one Red for the collector, are factory furnished. length. Each lead is to be run in separate conduit and must be of continuous run (do not splice) between Duct securement to the collar may be completed using the controller and the ionizing-collecting cell the predrilled flange. The seam should be made air and terminal connection in the junction box. watertight by caulking or gasketing. (b). Primary Wiring When a blower is installed downstream fr
ملخص المحتوى في الصفحة رقم 6
size, are electrically charged (positively) as they pass are required for the ionizer sections and 6.5 KVDC for through a high voltage ionizer. These charged particles the collector sections of the cells. are then attracted and adhere to a series of parallel collecting plates, which form the negative elements of an electrostatic field. 3. Initial Start-up The ionizer consists of charged stainless steel spiked A. Inspect the inside of the adjoining ductwork and blades spaced between grounded elec
ملخص المحتوى في الصفحة رقم 7
The ATS controller and remote PWM box both have 2. Filter-equipped exhaust systems shall not be LED indicating lights to show power to the PWM operated with filters removed. power supplies. Flickering or failed LED’s indicate electrical arcing and/or power failure. 3.The posted instructions for manually operating the fire extinguishing system shall be kept conspicuously 5. Periodic Maintenance A. Fire Suppression System (IF INSTALLED) – posted in the kitchen and reviewed periodically with Every
ملخص المحتوى في الصفحة رقم 8
power supply and the ionizing-collecting cell(s) they When a cleaning service is used, a certificate energize. The quantity of power supplies per unit is showing dates of inspection and/or cleaning shall be dependent upon unit size with one or two power maintained on the premises. supplies for each ionizing-collecting cell tier in height. Other than the basic hand tools, it is advantageous to WARNING have a volt meter with a 20 KVDC high voltage probe. Flammable solvents or other flammable These
ملخص المحتوى في الصفحة رقم 9
them away from any point of contact and energize the (4) Outage in the power supply. Look for charred or power supply. burned components or a loose wiring connection. Replace power supply or reconnect wiring. a. If either high voltage lead is defective the light will (5) Defective indicating light. Replace light. indicate the trouble. Each lead may then be checked separately by disconnecting them, one at a time, from d. Malfunctions other than short or open circuits. their respective term
ملخص المحتوى في الصفحة رقم 10
Troubleshooting Reference Chart PROBLEM/ PROBABLE LOCATION REASON - CORRECTION SYMPTOM CAUSE Ionizing Section of Cell 1. Dirty insulator(s) – Clean 2. Defective insulator(s) – Replace 3. Foreign Object Between Ionizing Bar and Ground electrode - Remove Collecting Section of Cell 1. Dirty insulator(s) - Clean 2. Defective insulator(s) – Replace Short Circuit 3. Foreign Material Bridging Plates - Remove 4. Bent Plates – Straighten or Replace High Voltage Leads 1. Disconnected High Voltage Lead Con
ملخص المحتوى في الصفحة رقم 11
ملخص المحتوى في الصفحة رقم 12
ملخص المحتوى في الصفحة رقم 13
ملخص المحتوى في الصفحة رقم 14
ملخص المحتوى في الصفحة رقم 15
ملخص المحتوى في الصفحة رقم 16
ملخص المحتوى في الصفحة رقم 17
ملخص المحتوى في الصفحة رقم 18
ملخص المحتوى في الصفحة رقم 19
ملخص المحتوى في الصفحة رقم 20