-INDEX- A. INSTALLATION INSTRUCTIONS 2 1. TECHNICAL DATA 2 – 4 (a) General Information (b) ER-Series heating Models (or GX, CW, AL, SC) (c) Typical Arrangement of Heater 2. PACKAGING AND SHIPPING 4 – 5 3. MOUNTING CLEARANCES 5 – 6 4. PRE-ASSEMBLY 6 5. INSTALLATION 7 6. GAS CONNECTION 8 – 9 7. ELECTRICAL CONNECTION 10 – 11 8. VENT REQUIREMENT AND DETAIL
ملخص المحتوى في الصفحة رقم 3
WARNING: Improper installation, adjustment, alteration, service or maintenance can cause property damager, injury, or death. Read the installation, operating, and maintenance instructions thoroughly before installing or servicing this equipment. A. INSTALLATION INSTRUCTIONS A.1 TECHNICAL DATA (a) General Information Model & Heat Input Information all units: ½-inch NPT Male Gas Supply Connection: Electrical Supply: 120V, 1 phase, 60Hz Curren
ملخص المحتوى في الصفحة رقم 4
Pipe Capacities For Propane and Natural Gas Pipe Capacities For Propane in Thousands of BTUs Per Hour For pressure drop of 0.5” W.C., based on low-pressure piping based on 6 oz. per sq. in. pressure. Based on one Cubic Foot of Propane = 2500 BTUs. SIZE LENGTH OF STRAIGHT PIPE IN FEET PIPE INCHES 15 30 45 60 75 90 105 120 150 180 210 240 270 300 450 600 ½ 105 77.5 65 55 50 45 40 ¾ 425 300 245 212.5 190 172.5 160 150 137.5 125 115 107.5 102.5 95 80 67.5 315 282.5 252.
ملخص المحتوى في الصفحة رقم 5
A.2 PACKAGING AND SHIPPING INFORMATION See Appendix ‘A’ for assembly drawings. Materials lists with part numbers and descriptions for each part will accompany each shipment. Heaters include: Burner/Control Radiant Tubes Reflectors Brackets Vacuum Fan U-Bend (U-Tube Units only) Wiring Junction Box
ملخص المحتوى في الصفحة رقم 6
A.2 PACKAGING AND SHIPPING INFORMATION (CONT.) Options: Fresh air Intake (Mounted to Burner/Control) Fan Vent Adapters- Vertical and Horizontal Thermostat Flexible Gas Connector Ball Valve Vent Hoods Hanging Assembly (chain, etc.) Shipping packages for individual projects will be boxed and crated as outlined on the specific bill of lading. A.3 MOUNTING CLEARANCES The heater should be positioned so that clearances from combustible materials will
ملخص المحتوى في الصفحة رقم 7
A.3 MOUNTING CLEARANCES (CONT.) MOUNTING HEIGHT ABOVE FLOOR Mounting 40,000 – 75,000 B.T.U 100,000 – 130,000 B. T. U. 150,000 B. T. U Position Horizontal Recommended 14 ft 16ft 18ft Minimum 12ft 14ft 16ft Inclined Recommended 11ft 13ft 15ft Minimum 10ft 12ft 14ft Ensure that there is adequate provision in the building for combustion and ventilating air supply. Installation must meet minimum requirements of applicable cod
ملخص المحتوى في الصفحة رقم 8
A.5 INSTALLATION Heater units: At this point raise the tube assembly into position and suspend from previously fixed chains (9 gauge min. galvanized welded link construction), or attach to wall mounting brackets. Wall mounting brackets must support heater at an angle of inclination of 45° ±10°. Longer tube assembly may be raised in more than one sub-assembly with final tube connection made in the air. It is recommended that the heater be suspended to slope slightly downward from
ملخص المحتوى في الصفحة رقم 9
A.6 GAS CONNECTION The gas connection on the heater is ½” NPT external thread. SERVICE REQUIREMENTS NAT. GAS L.P. GAS Max. inlet gas supply pressure (in.w.c.) 10.0 14.0 Min. inlet gas supply pressure (in.w.c.) 6.5 11.0 Injector sizes and manifold pressure for the burner are shown in the attached table for all heater units. The gas supply piping and connections must be installed so that the minimum pressure stated is achieved. A gas shut-off valve and union should be
ملخص المحتوى في الصفحة رقم 10
Air Inlets Natural Gas Liquid Petroleum Model Designation (Inches/ Millimeters) Orifice Orifice Input Injector Manifold Injector Manifold Model Tube Tube Dia. Burner Intake Fan Inlet KW Diameter Pressure Diameter Pressure Configuration (In) (in. / M.M.) (in. / M.M.) BTU/HR (inches) (in.W.C.) (inches) (in./mm) GH/ER/AL/SC 12/40,000 S-20 3" 1.125"/29mm 1.312"/33mm 0.130" 1.9 0.080" 6.7 S-25 3" 1.125"/29mm 1.438" /37mm 0.130" 1.9 0.080" 6.7 S-30 3" 1.125"/29mm 1.438" /37mm
ملخص المحتوى في الصفحة رقم 11
A. 7 ELECTRICAL CONNECTION (a) Burner/Control Internal Wiring IMPORTANT: All electrical work should be done by a qualified electrician in accordance with the National Electrical Code ANSI/NFPA 70. Supply: 120 V, 60 Hz, single phase Current Rating: 0.3 amp max 2319 Laurelbrook Street, Raleigh, NC 27604 · (800) 542-7221 · FAX (919) 834-4526 · www.ultimate-products.com - 10 -
ملخص المحتوى في الصفحة رقم 12
A. 7 ELECTRICAL CONNECTION (CONT.) The electrical supply to the heater is by three wires: live, neutral and ground connections. It is recommended that the supply cable be in metallic conduit to the 3/4'” hole provided. Power is ONLY supplied to the terminal in the back of burner as shown below: Power is supplied to fan through the knock out on the side of the burner housing. Fan leads should be connected to the burner
ملخص المحتوى في الصفحة رقم 13
A. 8 VENT REQUIREMENTS AND DETAILS (1) UNVENTED UNITS: Heaters may be installed without a flue providing the governing building codes are met and that consideration is properly given to possibilities of condensation on cold surfaces. Installation shall meet the following requirements when unvented: (A) Internal volume of the heated room must be greater than 214 cu. ft. per 100 BTU/HR of heaters installed. (B) Natural or mechanical means shall be provided to supply and exhaust at
ملخص المحتوى في الصفحة رقم 14
A. 8 VENT REQUIREMENTS AND DETAILS (CONT.) Flue joints should be sealed using RTV high temperature sealant and secured using at least three (3) sheet metal screws. Should condensation occur flue should be shortened or insulated. The terminal must exit the building at least 7 ft. above any area accessible to the public. The terminal must be at least 3ft. away from any air intake to the building. If the heater is equipped with ducted combustion air, the terminal must be at leas
ملخص المحتوى في الصفحة رقم 15
A.10 INSTALLATION CHECK OUT AND START UP Inspect installation and ensure that it has been carried out in accordance with these instructions. Ensure that electrical and gas supplies are isolated. The gas supply should be purged and tested for soundness in accordance with Local and National Safety codes. Open isolating gas valve and test gas connections for soundness using soap solution. Remove burner cover plate by unscrewing 6 screws. Take care not to damage the seal
ملخص المحتوى في الصفحة رقم 16
A.10 INSTALLATION CHECK OUT AND START UP (CONT.) To shut down the heater, switch off the power supply to the system. Automatic control of the heater or a series of heaters may be achieved by incorporating thermostats, time switches, manual over-ride switches etc. in the electrical supply to the heater(s). It is essential to allow a delay of 15 seconds after switching off the system before attempting to restart. If at any time after completion of the start up sequence, loss of
ملخص المحتوى في الصفحة رقم 17
B. SERVICE AND MAINTENANCE INSTRUCTIONS B.1 SERVICING INSTRUCTIONS Under normal working conditions, it is recommended that the Ultimate Products Heater should be serviced annually. In exceptionally dirty or dusty conditions such as may occur in a foundry, more frequent servicing may be desirable. Servicing work should be carried out by a qualified gas service engineer. IMPORTANT: 1. Never rest anything, especially ladders, against the heater. 2. Turn off gas and electrical s
ملخص المحتوى في الصفحة رقم 18
E. BURNER NER/ELECTRODE ASSEMBLY – Inspect the burner/electrode assembly by removing the six screws securing the combustion chamber cover plate to top of control box, taking care not to damage the sealing gasket. Remove the burner head by unscrewing it from the injector taking care not to drop it on the leads of the ignition electrodes. Replace the electrode assembly if it is not in good condition. The assembly is removed by removing the screws which attach it to the bracket on the
ملخص المحتوى في الصفحة رقم 19
B. 3 REPLACEMENT OF COMPONENTS WARNING: TURN OFF GAS AND ELECTRICAL SUPPLIES BEFORE STARTING REPAIR WORK. A. TO REPLACE ANY COMPONENTS IN THE BURNER/CONTROL ASSEMBLY – This assembly should be removed from the heater by disconnecting the gas and electrical supplies (also the fresh air intake duct if used). Loosen the bolts and slide the burner/control assembly from the emitter tube. B. TO REPLACE ELECTRODE ASSEMBLY – Remove top cover of combustion chamber by removing six (6) s
ملخص المحتوى في الصفحة رقم 20
F. TO REPLACE THE BURNER/CONTROL UNIT – Remove the control housing cover. After observing their positions, disconnect the wires to the burner control unit. Remove the screws securing the burner control unit to the base of the control housing. Remove the burner control unit. Install replacement unit, observing correct positions for color coded cables. G. TO REPLACE THE VACUUM SWITCH – Remove the burner control unit as in paragraph F. Disconnect the rubber tube connection at the va