ملخص المحتوى في الصفحة رقم 1
N series scales
Quick Install Guide
IMPORTANT - READ THIS FIRST
before plugging in your scale
These instructions describe how to quickly unpack and setup your N series scale.
Follow them carefully to install the scale, then refer to the Operating Guide for full
details of how to operate the machine.
For the N421 (2kg)
scale…
go to page 2
For the N521 (2kg), N621/N620 (5kg), N721/N720 (12kg) scales…
go to page 6
For the N921/N920 (35kg)
scales…
go to page 11
Select Select Select Postal Scal
ملخص المحتوى في الصفحة رقم 2
N421 install Installation Instructions Use these instructions if you have a N421, 2kg scale The scale looks like this: 1. Make sure you have: 3 Scale 3 Power Supply Unit (in its own box) 3 User Guide 3 Rates PROM (You may or may not be supplied with a Rates PROM. If one is supplied, fit it at step 4 or your scale may display incorrect rates. If one is not supplied, your scale has been pre-programmed with the current rates and will function without one until the next postage rate change). 3 Meter
ملخص المحتوى في الصفحة رقم 3
N421 install Installation Instructions 4. Install the Rate PROM 5. Locate the plug ports If you have been supplied with a Locate the plug ports under the front PROM, slide it into its slot ensuring the of the scale and plug in the small end opening in the PROM handle is in the of the power cable. top right corner. Press it firmly until it snaps into place. Refit platform. If a rate PROM has not been supplied, you can omit this stage. 6. Connect the 7. Tuck the cable(s) into postage meter cable t
ملخص المحتوى في الصفحة رقم 4
N421 install Installation Instructions 8. Level the scale Level the scale by turning the scale feet until the levelling bubble is centred Bubble and the scale does not wobble. must be in centre. Adjustable Feet (4) 9. Connect the meter cable to the postage meter If using a postage meter, connect the If your postage meter is fitted with an large end of the meter cable to the the optional Datalink unit, connect the meter as shown. Tighten the large end of the meter cable to the thumbscrews securel
ملخص المحتوى في الصفحة رقم 5
N421 install Installation Instructions 11.Enter your scale location code Note: Your scale will not work unless you perform this step. a. Find the location code corresponding to your location on the map. b. Enter the code via the numeric keys. c. Ensure that the code on the display matches your location code. d. Press Enter. 12.The scale is now ‘ready’ Select Select Select Category Zone Fees After entry of the location code, the scale goes through a short test sequence, then displays 0000g and th
ملخص المحتوى في الصفحة رقم 6
N500/600/700 series install Installation Instructions Use these instructions if you have a N521 (2kg), N620/N621 (5kg) or a N720/N721 (12kg) scale The scales look like this: N620, N621, N720, N721 N521 1. Make sure you have: 3 Scale 3 Power Supply Unit (in its own box) 3 User Guide 3 Rate PROM 3 Meter Cable (only if you ordered a Pitney Bowes Postage Meter at the same time as your scale) Power Supply User Guide Rate PROM Meter Cable Unit 2. Place your scale on a level surface Place the scale
ملخص المحتوى في الصفحة رقم 7
N500/600/700 Installation Instructions series install 3. Remove packing 4. Install the Rate PROM Lift the platform and remove the Slide the Rate PROM into its slot packing material. ensuring the opening in the PROM handle is in the top right corner. Press it firmly until it snaps into place. Refit platform. 5. Locate the plug ports Locate the plug ports under the front of the scale and plug in the small end of the power cord. N521 N620, N621, N720, N721 Page 7
ملخص المحتوى في الصفحة رقم 8
N500/600/700 series install Installation Instructions 6. Connect the postage meter cable If using a Postage Meter, plug the small end of the meter cable into the scale. N521 N620, N621, N720, N721 7. Tuck the cable(s) into the cable guides Tuck the cable(s) under the guides on the bottom of the scale. Turn the scale back onto its feet. N620, N621, N720, N721 N521 Bubble must be in centre. 8. Level the scale Level the scale by turning the scale feet until the levelling bubble is centred and the s
ملخص المحتوى في الصفحة رقم 9
N500/600/700 Installation Instructions series install 9. Connect the meter cable to the postage meter If using a postage meter, connect the If your postage meter is fitted with an large end of the meter cable to the the optional Datalink unit, connect the meter as shown. Tighten the large end of the meter cable to the thumbscrews securely. lower connector on the Datalink unit. Tighten the thumbscrews securely. DM series B900 B900 Datalink B700 10.Plug power supply unit into outlet Plug the power
ملخص المحتوى في الصفحة رقم 10
N500/600/700 series install Installation Instructions 11.Enter your scale location code Note: Your scale will not work unless you perform this step. a. Find the location code corresponding to your location on the map. b. Enter the code via the numeric keys. c. Ensure that the code on the display matches your location code. d. Press Enter. 12.The scale is now ‘ready’ After entry of the location code, the scale goes through a short test sequence, then displays 0g and the Select Category message. T
ملخص المحتوى في الصفحة رقم 11
N900 series install Installation Instructions Use these instructions if you have a N921, Weighing platform 35kg scale The scale looks like this: Note: The weighing platform and control module are separate units connected by Control module a single cable. 1. Make sure you have: 3 Scale control module and platform 3 Power Supply Unit (in its own box) 3 User Guide 3 Rate PROM 3 Meter Cable (only if you ordered a Pitney Bowes Postage Meter at the same time as your scale) Power Supply User Guide Rate
ملخص المحتوى في الصفحة رقم 12
N900 series install Installation Instructions 3. Assemble the 4. Remove the control weighing platform module cover Place the cover on the weighing Remove the cover from the top rear platform. Press down on each corner of the control module and set aside. to be sure it is completely seated. 5. Install the Rate PROM 6. Connect weighing Slide the Rate PROM into the slot with platform to control the unlabelled side facing you. Press module it firmly until it snaps into place. Refit Turn the control
ملخص المحتوى في الصفحة رقم 13
N900 series install Installation Instructions 7. Locate the plug ports Locate the plug ports under the front of the control module and plug in the small end of the power cable. 8. Connect the postage meter cable If using a Postage Meter, plug the small end of the meter cable into the control module. 9. Tuck the cable(s) into the cable guides Tuck the cable(s) under the guides on the bottom of the control module. Turn the module back onto its feet. Page 13
ملخص المحتوى في الصفحة رقم 14
N900 series install Installation Instructions 10.Connect the meter cable to the postage meter If using a postage meter, connect the If your postage meter is fitted with an large end of the meter cable to the the optional Datalink unit, connect the meter as shown. Tighten the large end of the meter cable to the thumbscrews securely. lower connector on the Datalink unit. Tighten the thumbscrews securely. DM series B900 B900 Datalink B700 11.Plug power supply unit into outlet Plug the power supply
ملخص المحتوى في الصفحة رقم 15
N900 series install Installation Instructions 12.Enter your scale location code Note: Your scale will not work unless you perform this step. a. Find the location code corresponding to your location on the map. b. Enter the code via the numeric keys. c. Ensure that the code on the display matches your location code. d. Press Enter. 13.The scale is now ‘ready’ After entry of the location code, the scale goes through a short test sequence, then displays 0g and the Select Category message. This is t
ملخص المحتوى في الصفحة رقم 16
Problems? • If you experience any problems installing your equipment, refer to the Troubleshooting section in the Operating Guide supplied with the machine. • If you want to configure the scale to more closely match your personal requirements, refer to the section ‘Changing/Selecting Setup Options’ in the Operating Guide. • Installation help and other useful information is available on our support web site at: http://www.pitneybowestsg.com/public/cinstall.htm • You can also telephone one of our