OPERATION WARNING: MOVING BEATER IN BOWL, KEEP HANDS, CLOTHING, AND UTENSILS OUT WHILE IN OPERATION, DO NOT USE WITHOUT INTERLOCKED GUARD. The P660 mixer is equipped with an Electro-Mechanical Timer Control (described at the bottom of this page). Also, become familiar with the other operating parts (Fig. 2) and their functions, which are referenced throughout the OPERATION section (pages 5 – 8). The Bowl Guard must be in position or the mixer will not operate. Refer to page 7. If the Bowl Sup
ملخص المحتوى في الصفحة رقم 6
BOWL LIFT The Handwheel is used to raise and lower the bowl on mixers with the standard bowl lift. Turn the Handwheel clockwise to raise the bowl or counterclockwise to lower it. MIXING This section explains operation of the mixer and how to install bowls and agitators. Bowl New mixer bowls and agitators (beaters, whips, and dough arms) should be thoroughly washed with hot water and a mild soap solution, rinsed with either a mild soda or vinegar solution, and thoroughly rinsed with clear water
ملخص المحتوى في الصفحة رقم 7
Bowl Guard (Fig. 3) The Wire Cage Assembly on the Bowl Guard can be rotated out-of-the-way to add ingredients or access the bowl and agitator. To rotate the Wire Cage Assembly to the rear . . . Push the Latch in to release the Centering Pin from the Centering Ramp. Note how the grooves on the nylon Retainers allow the Wire Cage to ride around the circular Ridge of the planetary Drip Cup. The Wire Cage can rotate 360°; left or right. When the Wire Cage returns to the front and center position,
ملخص المحتوى في الصفحة رقم 8
Mixer Speed On P660 mixers equipped with single-speed gearing, all work is performed at that speed. Bowl Scraper Attachment The Mixer Bowl Scraper Attachment (when ordered) is provided with a separate instruction manual covering its installation, operation, use and care. CLEANING WARNING: DISCONNECT ELECTRICAL POWER SUPPLY AND PLACE A TAG AT THE DISCONNECT SWITCH INDICATING THAT YOU ARE WORKING ON THE CIRCUIT BEFORE BEGINNING ANY CLEANING PROCEDURE. A flat scraper and a brush are furnished to a
ملخص المحتوى في الصفحة رقم 9
Planetary Seal Occasionally, the planetary seal (Fig. 4) may become dry and begin to squeak. To correct this, work a little lubrication under the lip of the seal. Transmission The transmission oil should be even with the line on the Oil Level Gauge when the motor is NOT running. If the oil falls below this line, DISCONNECT ELECTRICAL POWER SUPPLY and remove the Top Cover, which is secured by two screws. Remove the Transmission Fill Plug (Fig. 5) and add a small amount of the recommended transm
ملخص المحتوى في الصفحة رقم 10
ADJUSTMENTS Agitator Clearance The agitator clearance should be checked with each bowl change. The agitator must not touch the bowl 5 and the maximum clearance between the bottom of the bowl and the E or ED Dough Arm is 8mm ( ⁄16"). Install a Bowl and Agitator. If the Bowl and Agitator come into contact before the Bowl Support reaches its stop, adjust the Stop Screw upwards following the procedure below. To Measure the Clearance . . . Pour enough flour in the bowl to cover the bottom of the bo
ملخص المحتوى في الصفحة رقم 11
TROUBLESHOOTING SYMPTOMS POSSIBLE CAUSES Mixer will not start. 1. Circuit protector in open position — check fuse or disconnect switch. 2. Mixer or attachment overloaded. 3. Bowl not all the way up. 4. Wire Cage Assembly is not in the front-center position. Agitator touches bowl. 1. Bowl clamp(s) not closed. 2. Improper agitator clearance — see MAINTENANCE for adjustment procedure. 3. Bowl clamp(s) improperly adjusted — see MAINTENANCE for adjustment procedure. Planetary seal squeaks. 1. Seal re
ملخص المحتوى في الصفحة رقم 12
FORM 23038 (12-95) – 12 – PRINTED IN U.S.A.
ملخص المحتوى في الصفحة رقم 1
P660 MIXER
P660 MIXERS
ML - 104605
EXECUTIVE OFFICES
701 RIDGE AVENUE
TROY, OHIO 45374-0001
FORM 23038 (12-95)
ملخص المحتوى في الصفحة رقم 2
123456789012345678901234567890121234567890 1 2345678901234567890123456789012123456789 0 1 2345678901234567890123456789012123456789 0 Installation, Operation, and Care of 1 2345678901234567890123456789012123456789 0 1 2345678901234567890123456789012123456789 0 1 2345678901234567890123456789012123456789 0 1 2345678901234567890123456789012123456789 0 P660 MIXERS 1 2345678901234567890123456789012123456789 0 1 2345678901234567890123456789012123456789 0 1 2345678901234567890123456789012123456789 0 1 2
ملخص المحتوى في الصفحة رقم 3
INSTALLATION UNPACKING Immediately after unpacking the mixer, check for possible shipping damage. If this machine is found to be damaged after unpacking, save the packaging material and contact the carrier within 15 days of delivery. Prior to installation, test the electrical service to assure that it agrees with the specifications on the machine data plate. LOCATION Place the mixer in its operating location. There should be adequate space around the mixer for the user to operate the controls
ملخص المحتوى في الصفحة رقم 4
INSTALLATION CODES AND STANDARDS The installation of this appliance must be carried out by a licensed installer and in accordance with the applicable regulations, standards, codes of practice and related publications of the country of destination. ELECTRICAL CONNECTIONS WARNING: ELECTRICAL AND GROUNDING CONNECTIONS MUST COMPLY WITH THE APPLICABLE PORTIONS OF RELEVANT ELECTRICAL CODES. WARNING: DISCONNECT ELECTRICAL POWER SUPPLY AND PLACE A TAG AT THE DISCONNECT SWITCH INDICATING THAT YOU ARE W