PB Heat WBV Series user manual

User manual for the device PB Heat WBV Series

Device: PB Heat WBV Series
Category: Boiler
Manufacturer: PB Heat
Size: 0.7 MB
Added : 9/18/2013
Number of pages: 26
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for PB Heat WBV Series. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with PB Heat WBV Series.

For your convenience

If looking through the PB Heat WBV Series user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual PB Heat WBV Series on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual PB Heat WBV Series to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
PB Heat WBV Series User manual - Online PDF
Advertisement
« Page 1 of 26 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual PB Heat WBV Series but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to PB Heat WBV Series. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

Series WBV/WV
Oil Boilers
®
As an ENERGY STAR Partner, PB Heat, LLC has determined that certain firing
®
rates of this product meet the ENERGY STAR guidelines for energy efficiency.
Installation,
Operation &
Maintenance
Manual

Summary of the content on the page No. 2

TABLE OF CONTENTS TABLE OF CONTENTS USING THIS MANUAL 1 5. BURNER SETUP & BOILER OPERATION 13 A. INSTALLATION CLEARANCE . . . . . . . . . . . . .1 A. BURNER INSTALLATION . . . . . . . . . . . . . . .13 B. SPECIAL ATTENTION BOXES . . . . . . . . . . . .1 B. BURNER START-UP AND ADJUSTMENT . .13 1. PREINSTALLATION 2 C. CHECK BOILER CONTROLS . . . . . . . . . . . .13 D. PURGE AIR FROM THE SYSTEM A. CLEARANCES . . . . . . . . . . . . . . . . . . . . . . . .2 (WATER BOILERS ONLY) . . . . . . . . . . .

Summary of the content on the page No. 3

USING THIS MANUAL USING THIS MANUAL Indicates a condition or hazard which DANGER A. INSTALLATION CLEARANCE will cause severe personal injury, death or major property damage. Follow the installation instructions provided in this manual in the order shown. The order of these Indicates a condition or hazard which instructions has been set in order to provide the installer WARNING may cause severe personal injury, with a logical sequence of steps that will minimize death or major property damage. po

Summary of the content on the page No. 4

PREINSTALLATION 1. PREINSTALLATION Read carefully, study these instructions before beginning work. It will save time. Study the included drawings. Save these instructions for reference. This boiler must be installed by a qualified contractor. The boiler warranty can be voided if the boiler is not installed, maintained and serviced correctly. The equipment shall be installed in accordance with those installation regulations in force in the NOTICE local area where the installation is to be made, i

Summary of the content on the page No. 5

PREINSTALLATION For Example: C. CHIMNEY / VENT AND DRAFT CONTROL Old New An oil-fired unit shall be connected Comments Installation Installation CAUTION to a flue having sufficient draft at all times, to assure safe proper No change, but older operation of the unit. Chimney chimneys (especially unlined -.04" -.04" Draft ones) have leaks which 1. Draft Requirement – Minimum draft required in the reduce draft. vent system is -.03" to -.06" W.C. depending on Boiler boiler model, see Table 7.1 (Sect

Summary of the content on the page No. 6

BOILER PLACEMENT AND ASSEMBLY 2. BOILER PLACEMENT AND ASSEMBLY A. SETTING THE BOILER C. JACKET ASSEMBLY (KNOCKDOWN BOILERS) 1. Provide a level foundation, located as close as possible to the center of the heating system. 1. If the boiler is to be installed with a rear flue outlet, remove the square knock-out in the back panel. 2. Refer to Figures 2.1 and 2.2 for exploded view of boiler while checking and/or assembling parts of the 2. Attach back panel to bosses on middle of back boiler. section

Summary of the content on the page No. 7

BOILER PLACEMENT AND ASSEMBLY Figure 2.1: Steam boiler Figure 2.2: Water boiler (See Table 8.1 for parts identification). 5

Summary of the content on the page No. 8

PIPING AND CONTROLS 3. PIPING AND CONTROLS Do not pipe boiler before jacket is 4. When the return temperature from the system will be NOTICE installed. below 150°F on oil boilers for extended periods (heat pump systems, outdoor reset, snow melt, etc.), provide piping and controls to protect the boiler from A. PRESSURE TEST BLOCK ASSEMBLY condensation. Condensation will damage the boiler and will lead to shortened boiler life and 1. Make up cold water supply connection to the boiler. maintenance

Summary of the content on the page No. 9

PIPING AND CONTROLS 2. If not using a tankless coil, cover the heater opening E. TANKLESS HEATER OR COVERPLATE with cover plate (item 7 or 16). 1. If a tankless coil is used (item 9), install as pictured. Be sure rubber gasket is in place On water boilers, install in opening in front section. NOTICE between cover plate or water heater On steam boilers, install in opening in rear section. plate and boiler section. For suggested piping of tankless water heaters refer to Figures 3.3 and 3.4. F. CON

Summary of the content on the page No. 10

PIPING AND CONTROLS Figure 3.5: Piping to Isolate Boiler from Chilled Medium on Chiller Systems Figure 3.7: Float Low Water Cut-off Figure 3.6: Piping with Peerless Indirect Water Tank 8

Summary of the content on the page No. 11

ELECTRICAL 4. ELECTRICAL 3. Install burner harness located in the burner carton. A. GENERAL Beckett or Carlin – PP7024 Harness All electrical wiring shall be done in accordance with the (11-1/2" conduit) National Electrical Code and Local Requirements. Single Riello – PP7023 Harness (17-1/2" conduit) pole switches including those of safety controls or protective devices shall not be wired in a grounded line. 4. For complete information on servicing and adjustment of controls, refer to the attac

Summary of the content on the page No. 12

ELECTRICAL Figure 4.2: Water Boilers, Knockdown Figure 4.3: Water Boilers, Packaged 10

Summary of the content on the page No. 13

ELECTRICAL Figure 4.4: Steam with Float Low Water Cut-Off Figure 4.5: Steam with Probe Low Water Cut-off 11

Summary of the content on the page No. 14

ELECTRICAL Figure 4.6: Zoning with Circulators Figure 4.7: Zoning with Zone Valves 12

Summary of the content on the page No. 15

BURNER SETUP & BOILER OPERATION 5. BURNER SETUP & BOILER OPERATION Burn only #2 Fuel Oil in this 2. Adjust burner and barometric draft control for CAUTION appliance. Do not use gasoline, highest CO (Maximum 13%) while maintaining a 0 ² crankcase drainings or any oil Smoke and -.01 to -.02" W.C. draft overfire. containing gasoline. All adjustments must be made using suitable instruments such as found in a Bacharach A. BURNER INSTALLATION Combustion Test Kit. 1. The oil burner is supplied with a m

Summary of the content on the page No. 16

BURNER SETUP & BOILER OPERATION Do not leave boiler unattended while CAUTION E. CLEAN THE BOILER firing burner. Operating boiler with (STEAM BOILERS ONLY) water below minimum permissible water level may fracture sections. 1. Clean the boiler within one week after initial start-up. Cleaning will be more effective if boiler operates a 7. Turn on burner. Allow boiler water to heat up to just day or two to loosen sediment and impurities in below steaming (180 - 200°F). Do not allow boiler to system.

Summary of the content on the page No. 17

BURNER SETUP & BOILER OPERATION Table 5.1: Beckett Burner Specifications BECKETT BURNER SPECIFICATIONS Start-up Settings Boiler Burner Burner Static Pump Head Nozzle Size Model No. Model No. Head Plate Pressure Setting Air Shutter Air Band WBV-03-085 AFG-F3¹ F3 3-3/8" 0.75 80° B HAGO³ 140 PSI 6.0 1 N/A WBV-03-105 AFG-F4 F4 3-3/8" 0.90 80° B HAGO 140 PSI 6.0 0 N/A 4 WBV-04-095 AFG-F4 F4 3-3/8" 0.85 80° B DEL 140 PSI 6.0 0 N/A WBV-04-125 AFG-F4 F4 3-3/8" 1.10 80° B HAGO³ 140 PSI 5.0 2 N/A WBV-04-

Summary of the content on the page No. 18

MAINTENANCE 6. MAINTENANCE WARNING Product Safety Information Refractory Ceramic Fiber Product This appliance contains materials made from refractory ceramic fibers (RCF). Airborne RCF, when inhaled, have been classified by the International Agency for Research on Cancer (IARC), as a possible carcinogen to humans. After the RCF materials have been exposed to temperatures above 1800°F, they can change into crystalline silica, which has been classified by the IARC as carcinogenic to humans. If par

Summary of the content on the page No. 19

MAINTENANCE A. GENERAL C. WEEKLY MAINTENANCE (WITH BOILER OPERATING) 1. Check pipes adjacent to cold walls or in unheated spaces. Insulate and tape them if necessary to be 1. Flush float-type low-water cut-off (if used) to remove sure they can't freeze up. Keeping the water moving sediment from the float bowl as stated in the at all times will reduce the likelihood of freezing. manufacturer's instructions. 2. If there is considerable foreign matter in the boiler D. MAINTENANCE OF SAFETY RELIEF w

Summary of the content on the page No. 20

MAINTENANCE 2. To thoroughly clean the boiler it must be brushed G. IF A LONG SHUTDOWN IS REQUIRED down from the top. Alternatively, for limited space or minimum clearance to combustible installations, 1. To take boiler out of service if the boiler and system cleaning the heat exchanger from the combustion are not to be used when temperatures are below chamber side is acceptable. If unit is extremely dirty, it freezing: may be necessary to brush from both directions. The a. Drain the boiler and


Alternative user manuals
# User manual Category Download
1 PB Heat EC Series User manual Boiler 0
2 PB Heat DE User manual Boiler 1
3 PB Heat MI User manual Boiler 0
4 PB Heat Gas/Oil s User manual Boiler 1
5 PB Heat ECT Series User manual Boiler 0
6 PB Heat Gas User manual Boiler 3
7 PB Heat MI/MIH series User manual Boiler 0
8 PB Heat MIH User manual Boiler 0
9 PB Heat WV Series User manual Boiler 0
10 Sony HDV 1080I HVR-M15N/M15P User manual Boiler 67
11 Sony HDV 1080I HVR-M25N/M25P User manual Boiler 50
12 A.O. Smith 200 User manual Boiler 2
13 A.O. Smith 201 User manual Boiler 7
14 A.O. Smith 750 & 1000 User manual Boiler 6
15 A.O. Smith GB/GW-400 User manual Boiler 10